Town of Mills River, Mills River, NC
In preparation for a new town hall and library building site and parking lot, approx. 18,000 cubic yards of import material, erosion control measures installed, storm drainage, Parking Lot and Drive construction, gravel base and asphalt paving, and water line installation. All at the direction of Mr. William G. Lapsley of W.G.L.A. Engineering of Asheville, NC.
Hendersonville, NC
Install 2400 LF of sewer force main along with lift station to manufacturing facility in Hendersonville, NC.
Town of Marshall, Marshall, NC
10,000 to 12,000 LF of Water line installation, Water Storage Tank Demo and site preparation for new tank, roadway improvements to upgrade and extend water service for the Town of Marshall at the direction of Michael Goforth, PE of High Country Engineering, PC Asheville.
Marshall, NC
Removal and replacement of +/- 10,600 LF of 8” ductile water line at the direction of William G. Lapsley & Associates of Asheville, NC.
Hendersonville, NC
Commercial site work for Beverly-Grant, Inc of Asheville, NC consisting of soils imports, erosion control, extensive storm drainage system which included AquaShield’s AquaSwirl System to filter storm water before leaving the site, curb and gutter, stone and asphalt paving.
Greer, SC
Contracted by Course Doctors of Hendersonville, NC to implement outlet structure and emergency overflow improvements to an existing +/- 5 acre lake dam and complete construct a new +/-3 acre lake upstream of the existing lake. Included clearing and grubbing, mass earth excavation and relocation during dam construction, intricate concrete outlet structures and piping, and meticulous erosion control & turf reinforcement implementation. All within just a few hundred feet of the newly occupied hospital and at the direction of engineer David W. Elliott, P.E. of DesignStrategies, LLC of Greenville, SC.
Hendersonville, NC
The Cummings Cove Company, LLC owners of Cummings Cove Golf & Country Club expanded their waste water treatment facilities to an 84,000 gallon state of the art treatment plant.
Laurel Park, NC
Site work included 15,000 CY import, storm drainage including underground storm water retention system. Owner/Builder: Beverly-Grant, Inc.
Asheville, NC
Another Beverly-Grant, Inc. project. Project included mass rock excavation, mass earthwork and a complex underground storm water storage/detention system.
Lake Lure, NC
Site work including 25,000 CY export, Erosion Control & Storm Drainage for Beverly-Grant, Inc. of Asheville, NC.
Travelers Rest, SC
Mass Excavation of 220,000 cubic yards of rock & dirt. First of three phases to remove a total of 800,00 cubic yards. Phase 1 was completed in 90 days.
Asheville, NC
Commercial site work for Beverly-Grant, Inc., which involved a 300 space parking lot along with the site work.
Hendersonville, NC
Earthwork/Site work consisting of 40,000 CY mass excavation, 1800 CY mass blasting, Water and Sewer Line extensions, Storm Drainage, Curb & Gutter, Sidewalk, Concrete and Asphalt Paving, Striping for a new Parking Deck and ER Addition. Completed on time.
Hendersonville, NC
Earthwork/Site work; Working directly with the engineer -- Import 15,000 CY fill, Concrete/segmented retaining walls, Laser level building sites, Water and Sewer Line extensions, Storm Drainage, Erosion Control. Clark and Co. built some exceptional walls. Completed on time.
Hendersonville, NC
Additions to two of Henderson County’s schools (Flat Rock Middle and Rugby Middle) involving massive storm drainage, 8000 CY soils import, erosion control installation, laser leveling of building pads, sewer line extensions, additional curb & gutter and paving for a new parking lot.