Cashiers, NC
Contracted through Course Doctors, Mr. Bud Smith, chief officer of the Wade Hampton Property Owners Association, chose Miller Brothers to handle the installation of +/- 5500 LF of 6” C900 PVC water line in their community in the mountains of western NC. Project entailed running new lines from existing wells to the main storage tank through the development and down to the golf course, connection to the existing storage tank, and an enormous amount of trench rock removal.
Hendersonville, NC
Turnkey construction of a small residential community for an out of town developer based in Indiana. Project include clearing & grubbing, erosion control installation and maintenance, road construction, storm drainage, water line extension, and asphalt paving.
Hendersonville, NC
Turn key construction of an additional mile or so of infrastructure to the existing 600 acre gated golfing community. Project includes road construction, storm drainage, water lines, sewer lines and lift stations, and paving of streets. Another William G. Lapsley & Associates designed project.
Etowah, NC
A 2000 plus acre private community. Seven Falls will feature an Arnold Palmer Premier Golf Club and a River Lodge and Outfitter located on the French Broad River. Civil designs by William G. Lapsley & Associates, P.A. of Asheville, NC.
Lake Lure, NC
Another gated community designed by Odom, Hollifield & Associates, Inc..
Tryon, NC
200 acre gated residential-community which included mass earthwork, erosion control and storm drainage. Civil designs by Odom, Hollifield & Associates, Inc. of Forest City, NC.
Hendersonville, NC
Turnkey residential subdivision from clear & grub to paving and hydro-seeding. DOT spec roads which included almost 2 miles of water line extension. Project managed by JLS Builders of Hendersonville.
Rutherford County, NC
Residential home sites situated on 2500 LF of roadway along a ridge top. A Devonshire project managed by Hickory Nut Construction Co of Lake Lure, NC
Hendersonville, NC
This was a 70 acre 60 home gated community. Turnkey construction project included: clearing & grubbing, EC, road construction, water lines & paving.
Avery's Creek, NC
This was the fourth & final phase of a residential subdivision. Turnkey site work included utilities & paving.
Hendersonville, NC
Retirement community-102 home sites. Complete road construction with all underground utilities.
Hendersonville, NC
Gated Community with dozens of estate-sized home sites. This was a complete turnkey project including road construction, erosion control, pond expansion & restoration, storm drainage, waterline extensions, asphalt & concrete paving, & landscaping.
Hendersonville, NC
An 80 acre formal community on a pristine piece of mountain property with numerous streams and a waterfall. The owners were to be residents of this community and demanded the highest quality of workmanship. Earthwork/Site work consisted of roadway clearing and grubbing, erosion control installation and maintenance, road construction per DOT specs., extensive storm drainage, and water line extensions. We participated in some of the initial site prep for the owners’ residents.
Copyright © 2023 Miller Brothers, Inc. - All Rights Reserved.
Website designed by Summit Marketing Group